Visualization of IzolPanel with Active TT coating on a window
/ IzolPanel · Active TT

A panel on the existing sash. No glass replacement.

A panel with Active TT nano-coating in a frame, mechanically mounted frame-to-frame on the existing window sash. No drilling, no metalwork, no glass removal.

IzolPanel is the third product of the IzolGlass line. Not a film, not a glazing unit: a panel with an Active TT nano-coating in a frame, mounted mechanically on the existing window sash - like an insect screen, without removal, without drilling. It works where film does not: on single-pane, low-emissivity, triple-pane and special windows. Commercial launch autumn 2026 - currently a reference pilot.

Commercial launch Q3 2026 · reference pilot

Frame to frame. Like a mosquito net.

The Active TT panel is fixed mechanically onto the existing window sash - frame to frame, without drilling and without removing the glass. A sealed air layer forms between the panel and the window: a third-pane effect that improves Ug and Uw. The window stays in place.

Mounting the IzolPanel frame to frame on an existing window Horizontal cross-section of a window. The exterior zone (outside) is on the left, the interior on the right. A framed Active TT panel is added to the existing double glazing, fixed mechanically frame to frame. A sealed air layer forms between the panel and the window - a third-pane effect - improving the Ug and Uw values. IzolPanel Active TT nanocoating · frame to frame third-pane effect sealed air layer double glazing existing window Active TT panel selective nanocoating frame to frame like a mosquito net Effect Ug - lower Uw - lower declared · tests Q3 2026 outside interior The window stays in place. The panel adds a pane and a sealed air layer - like a third pane.

/ Status

The road to the Q3 2026 commercial launch.

Technical parameters are declared and pending confirmation in Q3 2026 tests.

  1. Certification tests for declared parameters

    IR blocking, UV blocking, VLT, Ug improvement, Uw improvement and declared target cost below PLN 300/m² will be confirmed or corrected after tests.

    Declared parameters - Q3 2026 tests
  2. Pilot for 3-5 reference buildings

    Priority: heritage, office and school buildings. The goal is before and after measurement plus seasonal mounting mode validation.

    Q3 2026 pilot plan
  3. IzolPanel commercial launch

    Commercial launch is planned after the pilot and confirmation of declared parameters.

    Q3 2026 product launch plan

Three routes to a better window.

Film works on serviceable double-glazed units. The panel - where film does not work. Window replacement - a last resort.

IzolGlass film Active TT on glass
IzolPanel panel in a frame
Window replacement new window
Glass type
IzolGlass film Active TT on glass serviceable double-glazed
IzolPanel panel in a frame single-pane, low-E, triple-pane, special
Window replacement new window any
Intervention
IzolGlass film Active TT on glass applied to the glass
IzolPanel panel in a frame frame-to-frame, no drilling
Window replacement new window full frame removal
Cost PLN/m²
IzolGlass film Active TT on glass ~PLN 300-350/m²
IzolPanel panel in a frame <PLN 300/m² (declared)
Window replacement new window PLN 2,000-4,000/m²
Time on site
IzolGlass film Active TT on glass 1-3 days
IzolPanel panel in a frame minutes per window (declared)
Window replacement new window months
Availability
IzolGlass film Active TT on glass today
IzolPanel panel in a frame launch Q3 2026
Window replacement new window today
Reversibility
IzolGlass film Active TT on glass reversible
IzolPanel panel in a frame reversible, removable
Window replacement new window permanent

Panel values marked (declared) await confirmation in Q3 2026 certification tests.

/ Declared parameters - Q3 2026 tests
90-96%
IR blocking (declared)
Declaration - Q3 2026 tests
>99%
UV blocking (declared)
Declaration - Q3 2026 tests
60-73%
VLT (declared)
Declaration - Q3 2026 tests
30-40%
Ug improvement (declared)
Declaration - Q3 2026 tests

The panel is designed for windows you do not want to replace.

Mounting, fit and seasonal use follow one principle: the existing window stays in place.

IzolPanel on an existing window sash
/ 01

Mechanical frame-to-frame mounting

The panel is mounted mechanically on the existing window sash, frame-to-frame. No drilling, no metalwork and no glass removal. Declared installation time is 2-4 minutes per window, pending Q3 2026 pilot confirmation.

2-4 min declared installation, Q3 2026 tests frame-to-frame mechanical mounting

Product declaration - Q3 2026 pilot

Diagram of Active TT coating operation on glass
/ 02

Where film does not work

The scope includes single-pane, low-E, triple-pane, armoured and special glass. The panel is a separate framed element, so it does not require direct application to the glass surface.

low-E glass type in panel scope triple-pane glass type in panel scope

IzolPanel application scope - Q3 2026

Diagram of heat loss through a window
/ 03

Seasonal mode

The same operating logic supports two seasonal scenarios: interior-mounted in winter and exterior-mounted in summer. The mounting side will be validated in the reference pilot.

winter interior-mounted summer exterior-mounted

Seasonal mode - Q3 2026 pilot

/ Window stock

Around 110 million windows in Poland are below current thermal standards - IzolPanel is designed for buildings where full replacement is not the first decision.

Discuss a pilot →

Apply for a reference pilot.

In Q3 2026 we are looking for 3-5 reference buildings: heritage, office and school. The form leads to direct contact with the team.

Technical values are declared and pending Q3 2026 certification tests. Mounting is mechanical frame-to-frame only.